Hi, Is there a possibility to specify a production version of component in the BOM. For example: I have FERT F01 and F2 and in both is included the same SEMI S01, which have two production versions. I want when run MRP in F01 - S01 to be with version1 and in F02 - S01 with version 2. Is it possible?
↧