Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 3276

FILLP Operation in Time Evaluation schema not able to change CLTIM

$
0
0

Problem Statement –

 

Short Text

FILLP Operation in Time Evaluation schema not able to change CLTIM

Long Text

There is a request from business and a development is on with close delivery and in design of a rule require to change the CT value (CLTIM) in TIP Entry. The FILLP Operations used with all available parameters are not able to successfully manipulate the CLTIM (Processing Type/ Time Type Class - CT) in TIP Entry. Please provide a standard solution to have TIP entry CLTIM value modified in Time Evaluation Schema.

 

Background –

We have a business requirement to split the present REGL HRS TIP entry into two entries as follows –

 

Original Entry -

1.jpg

Split Entry required to be split as with CT value being 19 / 20 depending on a condition of PNUM hrs of original entry shown above –

 

2.jpg

 

Now two rules have been developed in order to have this Original TIP entry split in to 2 and then the newly generated entry (through Operation GENTG H) is being edited via Operation FILLP.

 

3.jpg

 

The problem I am facing here is - I am not able to fill all fields in TIP Record of all the newly generated entry above through below rule

 

4.jpg

 

But I am not able to edit/change the CT field as required under this development. I am aware that Table T554S controls this Processing Type/Time Type Class (CT) field however, there must be a way in STD SAP Operations to change / edit this original value in TIP Entry by using FILLP Operation. I have scanned the SAP STD documentation in PDSY but there is no suitable Parameter which I can use to edit CLTIM (CT) filed in TIP Entry.

 

 

Many thanks in advance! 


Viewing all articles
Browse latest Browse all 3276

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>